BuySellProperty
LoginPost Property
Buying · 6 min read · Updated 1 October 2026

Possession handover checklist: what to inspect before you take the keys

Walk the flat with this list before you sign the possession letter; fixing things afterwards is much harder.

Key points

  • Ask for the possession letter, occupancy certificate, itemised final demand and approved floor plan.
  • Bring a tape, spirit level, charger, torch and bucket of water to test the flat.
  • Check walls for damp, tap tiles for hollowness and test every door, window, socket, tap and drain.
  • Get a dated snag list with photographs countersigned by the builder's representative.
  • Under RERA, defects reported within five years of possession must be fixed free within 30 days.

Before the visit

Start your flat possession checklist before the visit: ask for the possession letter, the occupancy certificate, the final demand with every charge itemised, and the approved floor plan. Check the carpet area in the sale agreement against what you measure.

Bring a tape measure, a spirit level, a phone charger to test sockets, a torch and a bucket of water.

Walls, floors and ceilings

Look for cracks, damp patches and uneven paint, especially under windows and near bathrooms. Tap floor tiles: a hollow sound means poor bonding. Check that floors slope towards drains in wet areas.

Doors, windows and fittings

Open and lock every door and window. Check frames for gaps, and that sliding windows run smoothly and seal. Test every switch, socket, fan point and the distribution board.

Kitchen and bathrooms

Run every tap and flush, and pour water to check drains do not back up. Look under sinks for leaks after a few minutes. Check hot water, exhaust fans and the gas line if one is provided.

Before you sign

Write every defect in a snag list, with photographs, and get it countersigned by the builder's representative with a date for repairs. Under the RERA Act, the builder must fix structural defects and workmanship problems reported within five years of possession, at no cost, within 30 days.

Collect the keys, meter readings, appliance warranties, the society or maintenance agreement and receipts for every payment.

Common questions

Should I sign the possession letter if there are defects?

Sign only with the snag list attached and acknowledged. The RERA defect liability period (five years) still applies after possession, but a written list from day one is the strongest record.

What is an occupancy certificate →Buying in a new project checklist →

Sources

  • Real Estate (Regulation and Development) Act, 2016: section 14(3), defect liability

Last checked 2026-10-01.

Work it out for your property

Next step →Snagging and home inspection at possession: what to check and how to record it11 min read
More on buying a homeMore articlesOpen checklists

Related guides

BUYING
Ready-to-move vs under-construction: which flat should you buy?
10 min read →
BUYING
Buying under-construction property: RERA protections and the risks
9 min read →
BUYING
Final checks before you buy: a step-by-step guide
8 min read →
BUYING
High-rise vs low-rise society: which building should you live in?
10 min read →

Review documents with an independent professional before committing funds.